• Condo syndicates · managers · owners
  • Quoted by phase

Painting for condo complexes and rental buildings

Corridors, lobbies, stairwells, garages, facades and units, planned as one project in phases. Boards and managers get a clear proposal, notices for residents and a report at every stage.

Get my free written quote 📞 1-833-807-6660
  • Board-ready proposals
  • Phased so residents keep access
  • Products and colours documented
Painting crew ready for a building project
Large buildingsQuoted by phase

The short answer

Residential complex painting in short

We Painters paints condo complexes, apartment buildings and multi-building rental properties in Greater Montreal: lobbies, corridors, stairwells, parking garages, facades, balconies and individual units. The work is planned in phases with a master schedule, a price per phase, notices for residents and a photo report for the board or owner.

What boards need

Built for the people who answer to owners

A board has to explain every decision to co-owners. Our proposals are designed to make that easy.

Clear scope per phase

Each phase lists the areas, surfaces, products, schedule and price, so the board can approve one or all.

Comparable format

If you’re collecting several quotes, our itemized format makes it easy to compare scope line by line.

Resident communication

Notices to post, phasing so there’s always an access route, and clean common areas every day.

Records for the building

Product list, colour codes and photo report for your maintenance records.

Areas we paint in a complex

Each area has its own constraints and products.

AreaTypical constraintOur approach
Lobby and entrancesFirst impression, heavy trafficScrubbable finishes, work outside peak hours
CorridorsResidents’ accessFloor by floor, doors in hard enamel
StairwellsFire exits must stay usableSection by section, never blocked
Parking garagesCars, salt, humidityZone by zone, line markings, concrete coatings
Facades and balconiesWeather, height, permitsPer elevation, see facade painting
Individual unitsOwners’ schedulesBooked unit by unit, invoiced separately

Planning

A master schedule for the whole property

Large properties are rarely painted in one go. We build a master schedule that sequences interior common areas, garages and exteriors, taking into account the season, the budget and residents’ comfort.

Many boards spread the work over two or three years. The plan shows what’s done each year, so the cost can be planned in the building’s budget.

  • Interior work in the cold months
  • Exteriors in the warm season
  • Costs spread across budget years
Crew working in a residential building

What residents notice, and appreciate

Small things make a big difference in occupied buildings.

Notices in advance

Dates and areas posted a few days ahead.

Access maintained

There’s always a way in and out.

Low odour

Low-VOC products in enclosed areas.

Clean every day

Floors and elevators cleaned before we leave.

Price guide

How complex projects are priced

Every building is different, so we price by area and phase after a site visit.

WorkIndicative range (CAD, before taxes)What moves the price
CorridorsQuoted per floorDoors, frames, ceilings
StairwellsQuoted per stairwellHeight, railings
GarageQuoted per zoneConcrete coatings, markings
FacadeQuoted per elevationAccess, surfaces
UnitsQuoted per unitSize, repairs

Ranges reflect our current price guide. Your binding price is the one written in your quote after a visit or detailed photos.

What the proposal includes

Included in the quote

  • Site assessment of every area
  • Phase-by-phase scope and price
  • Master schedule
  • Resident notices
  • Photo reports and final product list

Quoted separately or declined

  • Structural, masonry or engineering work
  • Flooring or ceiling replacement
  • Work outside the building’s permitted hours

How the job runs

From site visit to final report

1

Site visit

All areas, constraints, rules.

2

Proposal

Phases, scope, products, price.

3

Board approval

Colours and phases confirmed.

4

Notices

Posted before each phase.

5

Phased work

Protect, prep, paint, clean.

6

Report

Photos, products, colour codes.

Fitting into the building’s maintenance plan

Quebec condo syndicates are expected to keep maintenance records and plan for future work. A repaint is part of that picture.

At the end of each phase, you receive the product list, colour codes and photos, ready to add to the building’s records. That makes future touch-ups and the next repaint much easier to plan.

Building work

Crew in a building
Common areasCorridors and stairwells phased floor by floor.
Painter on a building exterior
ExteriorsFacades and balconies in the warm season.

Proof from real sites

Ask another board about us

For building work, a reference from a board member or property manager is the best proof there is. Ask us for one.

Read our Google reviews

Building exterior painting

Questions we hear at estimates

Residential complex questions

Can the work be spread over several years?

Yes. Many boards split it by area or building to spread the cost.

Will residents have to leave?

No. Areas are phased so there’s always access, and residents are notified in advance.

Can you paint parking garages?

Yes, zone by zone, with concrete coatings and line markings where needed.

Can owners book their units at the same time?

Yes. Units are booked individually and invoiced to each owner.

Do you provide reports for the board?

Yes, photos at each stage and a final product and colour list.

Do you provide an insurance certificate?

Yes, before work begins, made out as the syndicate requires.

Where we work

📍 Plateau-Mont-Royal📍 Rosemont📍 NDG📍 Verdun📍 Ahuntsic📍 Laval📍 West Island📍 Longueuil📍 Brossard📍 Terrebonne

Full list on our service areas page.

Give the board something clear to vote on.

Book a site visit for your building or complex.
1-833-807-6660 · [email protected]

Get my free written quote 📞 Call 1-833-807-6660
Scroll to Top